Welcome to the Spyro Wiki's new home world!
Feel free to rewrite and expand the articles and upload images that are missing.
Engineering Quarterly: Difference between revisions
From the Spyro Wiki, the Spyro and Skylanders encyclopedia
No edit summary |
>Sclera1 No edit summary |
||
Line 14: | Line 14: | ||
{{SSL}} | {{SSL}} | ||
[[Category:Spyro: Shadow Legacy]] | [[Category:Spyro: Shadow Legacy]] | ||
[[Category:Items (Spyro: Shadow Legacy)]] |
Revision as of 14:25, February 24, 2023
Template:Items (Original)Engineering Quarterly is a book in Spyro: Shadow Legacy about the operational gate system in the Dragon Village that have been installed since 1128, explaining that the gates are operated by an underground system powered by breakers around the village.
It was left on the table inside a house in the Dragon Village.
Story
- The Amazing Dragon Village Gates
- The gate system in Dragon Village is a marvel of engineering. The gates replaced the original system back in 1128. Compromised of two composite sliding doors weighing 2.5 tons apiece. An underground system of hydraulics operates the gates, powered by a series of failsafe breakers spread throughout town.